Case Study, Field Operations NNPC Eighteen Operating Ltd Emergency Intervention
AKOS016L AKOS016S HSE Compliant Completed

Bill Energy Services Limited was engaged by NNPC Eighteen Operating Limited to execute an emergency intervention programme covering the repair, disconnection, and restoration of two onshore wells, AKOS016L and AKOS016S. The scope brought together wellhead engineering, integrity management, and unauthorised connection removal in a coordinated three-phase workstream, executed safely and to full regulatory compliance.

Field Documentation
Wellhead Site Inspection
02+
Wells Serviced
03
Work Streams
15+
Discrete Operations
100%
HSE Compliance
01
Workstream One

Wellhead Repair

Component-level restoration of the wellhead system, from initial inspection through to pressure testing and final documentation.

Evaluation

We conducted a comprehensive inspection and assessment of the wellhead to identify any damage or issues that necessitated repair.

Component Replacement

We replaced faulty or damaged wellhead components, including valves, seals, connectors, flanges, and related equipment to ensure proper functionality and safety.

Welding and Machining

We performed the necessary welding and machining activities to repair or modify wellhead components to specification.

Testing and Calibration

We conducted pressure testing, flow testing, and calibration of relevant instruments and equipment to ensure optimal performance following the repair.

Documentation

We provided detailed documentation of the repair work performed, including a comprehensive report highlighting the methods employed, materials used, and recommendations for further maintenance.

A coordinated wellhead recovery delivered safely, on time, and to the operational integrity standards that international operators rely on.

Field Operations Report
02
Workstream Two

Disconnection & Removal of Illegal Hot Tapping Line

Identification, investigation, and safe removal of unauthorised hot tapping lines compromising the integrity of the wellhead flowline system.

Inspection

We thoroughly inspected the wellhead flowline to identify any unauthorised or illegal hot tapping lines that posed a potential hazard or compromised the integrity of the system.

Investigation

We determined the source, purpose, and potential risks associated with the illegal hot tapping line before initiating any disconnection activity.

Safe Disconnection

We disconnected and removed the illegal hot tapping line in a safe and controlled manner, following industry best practices and HSE guidelines throughout the operation.

Mitigation Measures

We implemented preventive measures to deter future unauthorised connections and ensure the long-term integrity and safety of the wellhead flowline.

Reporting

We documented the disconnection and removal process with photographic evidence and provided a detailed report outlining the procedures followed and all relevant findings.

On-Site Execution
Flowline Restoration in Progress
03
Workstream Three

Restoration of Wellhead Flowline to Normal Operation

Reconnection, flushing, calibration, and verification of the wellhead flowline system, returning it to fully compliant production operation.

System Reconnection

We reconnected all authorised and compliant lines, valves, and components to restore the wellhead flowline to its normal operational configuration.

Flushing and Testing

We conducted flushing operations to remove any debris or contaminants from the flowline system, followed by rigorous testing to confirm system integrity and proper functionality.

Calibration and Adjustment

We calibrated and adjusted relevant instruments and controls to optimise the performance of the wellhead flowline system following restoration.

System Verification

We verified the proper operation of the wellhead flowline system, ensuring it met all safety, environmental, and regulatory requirements.

Documentation

We provided full documentation of the restoration process, including test results, calibration certificates, and details of any adjustments made to the system.

Outcome

Two Wells Restored to Full Compliance

AKOS016L and AKOS016S were returned to safe, compliant production operations. The intervention combined integrity engineering, flowline restoration, and unauthorised connection removal under a single coordinated workstream, delivered to international HSE standards and supported by complete documentation for the operator's records.

Need Similar Intervention Work?

Get in touch to discuss your wellhead, flowline, or emergency response requirements.

Read More

News

Bill Energy Services Limited completed Emergency intervention works for repair of oil well for NNPC EIGHTEEN OPERATING LTD

This includes the activities required for the repair, disconnection, and restoration of the wells AKOS016L and AKOS016S Wellhead Repair ▪ Evaluation: We conducted a comprehensive inspection and assessment...